Utilization:  Drillship 75.4%(86/114)  Jackup 75.8%(339/447)  Semisub 84.3%(145/172)

 

 
 
                Common sense wins in climate change case in California  EPA proposes quotas for renewable fuel, biomass-based diesel  ACE releases final SEIS for Alaska Stand Alone Pipeline Project  Cedigaz: Worldwide gas demand to rise 1.4%/year during 2016-40  Australia’s EMO says gas shortfall averted until 2030   Fairfield Geotechnologies finalizes Ikon Science JV  ‘Bridge to Nowhere’ leaves pent-up Permian gas problems unsolved  Result of Arbitration between Tullow Oil and Kosmos Energy  Seadrill provides update on West Leo early termination litigation  ConocoPhillips reports exploration success in Alaska    
HSEQ
Picture of the Day
Prev    1 / 3 Next
Quality Assurance
 hs01.jpg The QA section of this department is responsible for the quality of the drilling works and services and also the QA management system in the company. It ensures that all the functions are achieved according to related standards and technical specifications specified by the customer in compliance with good industry practice. To achieve this, proper procedures and work instructions covering the requirements of quality management are documented and implemented (ISO 9000 and ISO/TS 29000).

We are committed to becoming a leader in the scientific drilling community. Our services quality policy is aimed at achieving excellence in rendering these services by emphasizing:

  • Quality of products and services
  • Ongoing training for personnel at all levels.
  • Updating of equipment and operating techniques.
  • Cost efficiency
  • Customer satisfaction
 
© 2015 Global Petro Tech.  All Rights Reserved.
 
Best View : Resolution 1280*1024